Effective Project Management for Facility Renovation Helps Address Compliance Concerns

Project Management for Facility Renovation

Brevitas consultants managed and coordinated the design, construction, and commissioning of an engineering capital project for a global pharmaceutical company. Brevitas consultants successfully addressed compliance issues, remediate potential risks, and improve production capacity by applying their expertise in project management and technical assurance.

Industry

Pharmaceuticals

Area of Expertise

Engineering and Capital Projects

Duration

1.5 years

Services Provided

  • Program/Project Management
  • Engineering Design Support
  • Commissioning
  • Technical Documentation

Impact

A client’s production was temporarily shut down due to regulatory citations. Brevitas’ services in project management, project engineering, and design support during the facility renovation were pivotal in addressing the compliance concerns and improving future manufacturing capacity.

Business Challenge

To ensure our client could continue operating successfully following several compliance concerns cited by a regulatory agency, Brevitas consultants were brought in to remediate these issues and improve future manufacturing capabilities.

Our Approach

Brevitas consultants worked with cross-functional teams to manage and coordinate project activities. This led to the development of the project charter, construction plan, and preventative maintenance task plans. They then provided construction supervision to track project progress, resolve problems, protect client assets, and ensure workers’ safety.

Due to the sensitive nature of our client’s project, our consultants were required to attend to multiple remediation activities simultaneously during the project phase.

Results Achieved

  • Successfully delivered project on schedule and within budget
  • Installation of a new HVAC system
  • Upgrades to walk-in refrigerators and incubators
  • Developed a list of critical project equipment/instruments for maintenance registration and calibration
  • Qualified and handed over the newly renovated production facility, along with upgraded equipment and systems, to production for use
  • Updated all relevant SOPs for proper operator training

More Case Studies

2

Insights into Improvements: Building a Targeted Roadmap for ISO 9001 Aligned Optimization

Cloud Data Centers Explained _ TRG Datacenters

Closing IT Gaps to Achieve Audit Readiness

Cleanrooms Case Study (1)

GMP Audit Readiness for CGT Operations

Corridor

Accelerating GMP Readiness Through Risk-Based CQV and Strategic Execution

Untitled design

Regulatory Readiness: Brevitas’ Targeted Strategies for GMP Qualification of 50+ Benchtop CGT Systems

Driving Efficiency: Streamlining the Qualification of 15 BSCs with QRM. Project & Vendor Management

Driving Efficiency: Streamlining the Qualification of 15 BSCs with QRM, Project & Vendor Management

Untitled design (25)

Airflow Visualization Study to Address Audit Observations

science-7788808_1280 (1)

Validation Framework and Data Integrity Program for CGT Non-Profit Organization

Let's Get Started!

Our expert consultants will guide you step-by-step through the process of achieving tangible results and long-lasting improvements.