Brevitas streamlined the qualification of 15 Biosafety Cabinets (BSCs) by applying Quality Risk Management (QRM) principles and structured vendor oversight. Tailored protocols were aligned with the User Requirements Specification (URS) to ensure compliance, reduce redundancy, and deliver cost-effective results within a compressed timeline.

Industry

Pharmaceutical

Area of Expertise

Commissioning, Qualification & Validation

Duration

9 months

Services Provided

  • Risk Assessments 
  • Leveraging of Vendor Protocols 
  • Protocol Development and Execution 
  • Project Management 
  • Good Documentation Practice (GDP) Training  

Impact

Successfully qualified 15 Biosafety Cabinets (BSCs) within a compressed timeline by applying QRM to develop tailored protocols aligned with URS and pharmaceutical regulatory standards. 

Business Challenge

The client faced challenges in qualifying 15 Type A2 BSCs of various sizes (4 to 6 feet) for their Cell and Gene Therapy facility. Key risks included incomplete URS coverage in vendor protocols, limited execution time, lack of GDP awareness among vendor resources, and resource conflicts—leading to inefficiencies that jeopardized project timelines and regulatory compliance.

Our Approach

Brevitas implemented a structured, risk-based approach to streamline execution and ensure compliance. Key strategies included: 

  • Risk-Based Testing – Evaluated vendor protocols and leveraged strategic equipment relocation to optimize execution and reduce testing workload. 
  • Vendor Management – Conducted alignment meetings and delivered GDP training to ensure protocol execution met client expectations. 
  • Protocol Development – Leveraged vendor protocols to develop wraparound protocols, ensuring complete URS alignment without redundant effort. 
  • Project Scheduling – Executed select testing activities at a temporary location and coordinated all resources to identify early-start opportunities and maximize schedule efficiency. 
  • Real-Time Oversight & Proactive Risk Management – Enabled rapid issue resolution and maintained GDP compliance through continuous monitoring. 

Results Achieved

From initiation to completion, the Brevitas team played a critical role in the project’s success, as evidenced by the following outcomes: 

  1. Successfully qualified all 15 Biosafety Cabinets, minimizing delays and controlling costs. 
  2. Achieved full URS coverage through the development of compliant wraparound protocols. 
  3. Delivered the project on time and within budget. 
  4. Mitigated risks proactively using structured QRM methodologies. 
  5. Maintained the integrity of vendor qualifications through continuous oversight and coordination. 

More Case Studies

2

Insights into Improvements: Building a Targeted Roadmap for ISO 9001 Aligned Optimization

Cloud Data Centers Explained _ TRG Datacenters

Closing IT Gaps to Achieve Audit Readiness

Cleanrooms Case Study (1)

GMP Audit Readiness for CGT Operations

Corridor

Accelerating GMP Readiness Through Risk-Based CQV and Strategic Execution

Untitled design

Regulatory Readiness: Brevitas’ Targeted Strategies for GMP Qualification of 50+ Benchtop CGT Systems

Driving Efficiency: Streamlining the Qualification of 15 BSCs with QRM. Project & Vendor Management

Driving Efficiency: Streamlining the Qualification of 15 BSCs with QRM, Project & Vendor Management

Untitled design (25)

Airflow Visualization Study to Address Audit Observations

science-7788808_1280 (1)

Validation Framework and Data Integrity Program for CGT Non-Profit Organization

Let's Get Started!

Our expert consultants will guide you step-by-step through the process of achieving tangible results and long-lasting improvements.